Organise your project
in just a few steps
Manuals and hints for project administrators and participants.
Administrators & Owners
Basic functions
Plans & Documents
Tasks
Special functions
Plans & Documents
Your Planfred user account is created during registration. If your e-mail address already possesses a Planfred login by way of a project invitation, then registration is no longer necessary.
Register at: app.planfred.com/registration
Click Create password now in the confirmation e-mail and enter your desired password in the next step.
You may now log in with your e-mail address and your password at any time at: app.planfred.com
Use your Planfred access data to access all projects your own projects, as well as the ones that you have been invited to. In Projects (in top-centre), you may switch between the respective projects.
Hint
The password may be reset again at any time when logging in. Change the password in the user account (top right).
Each Planfred user (no matter whether you register yourself or receive an invite) is entitled to add their own projects, which starts the test phase.
Click Create your first project
Enter project title
Select your own role in the project, or, if it's not available, enter it in the “New role” field and click +
Click Create project
After 30 days, the user account of a project owner will become fee-based. Billing via e-mail does not take place automatically, however, but rather only after online ordering in the user account (package selection and billing address entry).
RECOMMENDATION: For the fee-based user account of the project owner, we recommend using an impersonal e-mail address. All projects should be created using this login. This provides one central account access to all company projects, and it is also the owner of all the data. The project managers are added in the respective project as administrators and therefore receive all permissions for project organisation.
Hint
The Project transfer function (in “Settings & backup”) enables you to transfer your project to the ownership of a participant (provided they have selected a package). If you no longer possess a project of your own, then you are no longer in the test phase.
Participants do not need to register and may use Planfred free of charge! Planfred sends invitation e-mails when participants are added. Participants also receives a link to the instructions: www.planfred.com/en/manual
Click Create new participant
Enter e-mail address
Select permission: Project participant, Project administrator or Participant without login
Optional plan approval permission
Upload notifier recommendation daily (each participant can switch off their upload notifiers themselves)
Select the role or enter into the “New role” field and click +
Enter last name, company, and telephone number (optional)
Optional personal message
Invite + add another one
Hint
Participants that are already added can be imported to additional projects (Add new participants and Import participant from another project).
Hint
By right clicking on a participant in the list, the following functions are available: Delete participant, Grant or revoke plan approval permission, Upload notifier (hourly, daily, OFF), Export contact.
Hint
In the participants detail view (click on participants) in Edit permission (top-right), a project participant may be made the project administrator retroactively or removed from project access, etc.
Project participants can only use there Planfred access data to log into projects that they have been invited to. The project login enables participants to download all project data and upload their plans and documents, and these are stored automatically under the assigned role. Each participant may only update or edit their own role. Plans and documents of other roles are only available to a participant with reading permission. In case of a team of multiple structural engineers, it is important that they are assigned the same role during project invitation.
Project administrators generally have the same permissions in the project as the project owners (nevertheless, they cannot delete the project or revoke project access from the owner). An administrator is entitled to invite other participants, to delete them, and to change participants. Furthermore, an administrator has access to “Settings & backup” and to all documents in the document vault. An administrator is allowed to edit or update all plans and documents of other roles and may also update data for other roles representatively by changing the author (this enables the plans and documents to be stored under the role of the author instead of their own role).
Participants without a login do not have access to the project and are only available as a recipient for manual delivery of plans and document via the download link via e-mail. In the participants detailed view, receipt can be checked (click on participants – see under activities, e.g. “Download“). Project invitation e-mails and upload alerts cannot be sent to participants without a login. Participant without a login can, however, be managed as authors, e.g. a surveyor’s plan under the “Surveyor” role.
RECOMMENDATION: We recommend sending bid request packages to participants without a login (Zip files) in a separate project (award package)! (Advantages: Recipients and technical planners cannot see bidders and sensitive data like offer evaluations, agreements, etc. can be managed without access permission). Plotting orders are processed by manually sending plans to participants without a login, in which case the order data are entered via text message.
As soon as at least one participant with plan approval permission is available in the project, the approval system for plans is activated. Next, when uploading a plan, select whether approval is required for this plan. If this plan should be approved, those who can approve it may be selected from a list of all participants with plan approval permission.
A participant will be informed automatically by e-mail, if a plan is waiting for their approval. The participants may now be approve or correct. Correction via text and/or attachment. The plan author is informed automatically via e-mail about corrections/approvals.
The approval system is always active for documents, and an approval may always be requested by any participant.
If a participant is deleted or project access is revoked from a participant (in the participants detailed view Edit permission to Participant without login), then all download links in the e-mails are deactivated. Deleted participants and participants without login no longer have access to the project. Deleted participants are moved into the recycle bin (activities are still accessible in the recycle bin. They can be restored at any time).
Your free Planfred user account was created with the first project invitation. You don’t need to register again! Click Create password now in the invitation e-mail and enter your desired password in the next step.
You may now log in with your e-mail address and your password at any time at: app.planfred.com
Use your Planfred access data to access all projects that you have been invited to. In Projects (in top-centre), you may switch between projects.
Hint
The password may be reset again at any time when logging in. Change the password in the user account (top right).
In case new plans and documents are uploaded, Planfred automatically sends messages, provided upload notifier is activated for the project.
A project participant can turn their upload alerts on or off themselves in the respective project (orange field in top-right). If daily is selected, Planfred will send a group e-mail at midnight including all new uploads over the last 24 hours.
Sorting the list view according to the most recent upload provides the best overview of new uploads in the project.
Activate filter Display all (top-left)
Click Last upload (on right in the list header)
Filter according to “Role/author” and “Plan or document folder”
Preview by right clicking on a plan or document and select Open PDF
Download multiple plans by clicking Download plans or Download documents (blue button to the right above the list)
Hint
The list may be sorted according to all criteria in the black list header bar.
ATTENTION: Each plan is created only once and must then be updated. Plans must not be created more than once so that the last status remains unique! Obsolete indices can be called up in the plan detail view (click on the plan, then under "Index history").
Click Create new plan
Select a print file (pdf, etc.) from the file system or clipboard
Select a CAD file (dwg, etc.) from the file system or clipboard
The file name is added automatically to the plan number field
Edit plan number/code: Remove the index and date and enter this into the “Index” field (the number remains unchanged in case of updates)
Enter the description into the “Plan content” field (searching utilises terms)
Select a plan folder
Select optional tags or create tag (enter into “New tag” field and click +)
Write optional comment
Request optional approval
Click Save + add another one
NOTE: All file formats may be uploaded, including Zip packages (e.g. As-built plans). Planfred does not specify plan encoding. Each participant can add plans with their own encoding system.
Hint
Plan numbers, plan authors, plan folders, etc. can be changed subsequently: Right-click on plan in list view, select the desired option in the pop-up window, make the change and save.
Hint
If, for example, the plan folder is to be changed for several plans: Click on Edit (blue button on the right above the list), select plans by means of a checkbox, click on the Edit button at the very bottom, activate the plan property to be changed, select the desired plan folder and click on Update x Plans.
ATTENTION: A previously uploaded plan needs to be updated! Reworked indexes can be accessed in the plans detailed view (click the respective plan).
Click Update plan
Select the plan to be updated
Select a print file (pdf, etc.) from the file system or clipboard
Select a CAD file (dwg, …) from the file system or clipboard
Enter index
Write optional comment
Request optional approval
Click Save index and return to list
Select the next document to be updated …
Hint
Right click with the mouse to open and update a plan in a new window (tab). You can open any number of windows (tabs) parallel to each other.
ATTENTION: Each document is only added once and is then updated. Documents may not be added multiple times, which means the most recent version remains clear! Reworked versions can be accessed in the documents detailed view (click on the document, then under "Version history").
Click Create new document
Select a file from the file system or clipboard
The file name is added automatically to the document number field
Edit document number: Remove the version and enter this into the “Version” field (the number remains unchanged in case of updates)
Enter the description into the “Document content” field (searching utilises terms)
Limit optional access ONLY ACCESSIBLE BY
Select document folder
Select optional tags or create tag (enter into “New tag” field and click +)
Write optional comment
Request optional approval
Click Save + add another one
NOTE: All file formats may be uploaded, including Zip packages (e.g. photos). Planfred does not specify document encoding. Each participant can add documents with their own encoding system.
Hint
Number/content, access authorisation, author etc. can be changed later: Right-click on the document in the list view, select the desired option in the pop-up window, make the change and save.
Hint
If, for example, the tags of several documents are to be changed: Click on Edit (blue button on the right above the list), select documents using the checkbox, click on the Edit button at the very bottom, activate the document property Tags, select the tags and click on Update x documents.
ATTENTION: A previously uploaded document needs to be updated! Reworked versions can be accessed in the documents detailed view (click the respective document).
Click Update document
Select the document to be updated
Select a file from the file system or clipboard
Enter the version (or date e.g. “200930”)
Write optional comment
Request optional approval
Click Save version and return to list
select the next document to be updated …
Hint
Right click with the mouse to open and update a document in a new window (tab). You can open any number of windows (tabs) parallel to each other.
Planfred offers two features that greatly facilitate the creation (initial upload) of multiple plans. The use of the clipboard ensures that no plans are overlooked and the ability to copy settings from the last plan saves time. Also, when updating plans and uploading documents, it makes sense to load all files to the clipboard first, as this ensures that no documents are forgotten.
click on My clipboard (top right)
load all CAD and/or print files of the new plans into the clipboard: either click on Select files or simply drag them from your own system into the clipboard
Close the clipboard (click on the cross in the upper right corner), the files will be uploaded in the background
click on Create new plan
insert print file from the clipboard: click on from Clipboard in the right area of the PRINT FILE field and select the desired file in the pop-up window
insert CAD file from the clipboard: click on from Clipboard in the right area of the CAD FILE field and select the desired file in the pop-up window
enter index and plan content; edit plan number; select plan folder, tags, etc.; write comment and/or request approval if necessary
click on save + add another one
click on Use settings from latest plan, the selection of settings to be applied can be edited (click on the checkmarks)
create and save the plan as described above
This process is repeated until there are no more plans to choose from in the clipboard pop-up window – so the list is cleared. Clicking on My clipboard (to the right of “Settings & Backup”) shows that all files in the clipboard have the status “assigned”.
PLEASE NOTE: Each plan is created only once and must then be updated. Plans must not be created more than once so that the last status remains unique!
Hint
The files in the clipboard can be sorted e.g. by file name (click on File name in the list header).
Click Download (blue button on right above list)
Filter by role/author, plan or document folder, tags (or entry into the search field)
Select the plans or documents using the check box (select all using the top check box)
Click Download (at the bottom)
Select folder structure (recommendation: Folder/Original)
Click Download files
Hint
Plans and documents may be sorted according to all criteria in the black list header bar. Preview by right-clicking on a plan or document and selecting Open PDF.
Click Send (blue button to the right above the list)
Filter by role/author, plan or document folder, tags (or entry into the search field)
Select the plans or documents using the check box (select all using the top check box)
Click on button Send (at the bottom)
Select the recipients
Add optional additional recipients: Click on + Add recipient, enter your details and click on add
Write message
Create optional signature template
Optional for plans “SEND PRINT FILES ONLY”
Click send
Hint
Save optional recipient selection as a personal group: Click on + Create recipient group, enter the name and click on save.
Hint
Save message as personal template: Select parts or all of the text, click on Save selected text as a block, enter the text block name and save.
Project owners and administrators have access to all tasks and can also comment and edit them. Participants see only the tasks assigned to them or to another participant of the same role, as well as those created by the participant or by participants of the same role.
In the webapp in the browser (app.planfred.com), Tasks appears as a tab between "Documents" and „Participants". All tasks appear in a list, just as in the case of plans and documents. The display can be specified via the filter functions.
In the project settings ("Settings & Backup" in the top right corner of the respective project) you can make all settings under "Tasks", such as renaming, removing or adding new categories, adding a fourth option to the location, renaming, removing or adding new location defaults.
Create tasks directly on your cell phone and save time. The new app for iOS and Android makes recording tasks even easier - and free of charge in all Planfred packages, whether Mini, Midi or Maxi.
After starting the app, you enter your user data in the browser as in the webapp. After logging in, you go directly to the project list and select the desired project. Clicking on "Tasks" takes you to the task list.
New tasks can be created by clicking the "+ New Task" button at the bottom center. These will be stored under "My drafts" until they are published and can only be viewed by the user.
Please now enter or speak a title and description (optional) and take a photo or upload a file (optional). Assign the category, responsibility and if necessary a deadline and add the location information.
Hint
Only one parameter is obligatory, as well as the responsibility in case of publication.
After clicking the "Save draft" button, the draft task will appear in the "My drafts" list.
Now you can either continue creating the task (by clicking the "+ New Task" button again) or publish the task design. To do this, click on the desired task and then on "Publish now".
Now the task is listed under "Tasks" for the task creator, his role, the project owner, all administrators and the responsible persons in the task list.
The webapp in the browser shows the new task as shown. If it does not appear at the top, you can sort the order by clicking on the number symbol.
The creation of a task in the webapp is started by clicking on the button "Create new task". All further steps are the same as creating a task in the smartphone app (see above).
In addition to the filter functions familiar from the webapp, there are three quick filters in the smartphone app, namely "Tasks for me", "Tasks from me" and "Clarification".
Hint
To deactivate all filters, click the Show all button.
The four statuses "Open", "In progress", "In clarification" and "Done" describe the status of the respective task and can be recognized via the colored bar on the left side (pale blue, blue, yellow and green).
To change the status, click on the status bar in the respective task and select the desired new status.
It is also possible to add a text, which will then appear in the "Task activities" (below).
Hint
Changing the status is also possible in the course of entering a new message. The input field for a new message is located directly below the "Task activities" area.
The task report informs about all new and changed tasks via e-mail once a day at midnight. Participants only receive information about the tasks they can view (tasks assigned to them and tasks created by the participant).
By activating the push notifications on the smartphone, one is additionally informed directly about all changes.
Every user (no matter whether they are registered or acting as a participant) is authorized to create his own projects and is therefore the owner of all this data. As the project owner, he is the only one who is allowed to delete these projects. The access to his projects can never be withdrawn from him as owner.
After 30 days, the user account of a project owner becomes subject to fees. Invoices are not submitted automatically, however, but rather only after ordering a package for the user account.
Hint
We recommend using an e-mail address for the user account of the project owner (fee-based) that is not personalised. After logging in to this user account, all projects may be created, which makes this e-mail address the owner of all of the data. (The respective project manager is invited as a participant with administrator rights and now manages the respective project).
Project administrators have almost the same rights in the project as the project owner (however, they cannot delete the project or revoke the owner's project access). An administrator is allowed to invite, delete, and change permissions of other participants. Furthermore, an administrator has access to "Settings & Backup" and to all documents with restricted access. An administrator is authorized to edit or update all plans and documents of other roles and can also upload data on behalf of other roles by changing the author (thus the plans and documents are not stored under his own role but under the author's role).
Project participants can only log in to projects to which they have been invited with their Planfred credentials. With their project login, participants are authorized to download all project data and upload their plans and documents, which are automatically filed under the respective assigned role. Each participant can only update or edit data of their own role. A participant has only read rights on plans and documents of other roles. In the case of a team of, for example, several structural engineers, it is therefore important that they are assigned the same role when they are invited to the project.
Participants without login have no access to the project and are only available as recipients for the manual sending of plans and documents via download link by e-mail. In the participant detail view, the receipt can be checked (click on participant - see activities below e.g. "Receiving"). No project invitation e-mails and upload messages are sent to participants without login. However, participants without login can be listed as authors, so that e.g. a surveyor plan can be found under the role "Surveyor".
Hint
We recommend sending tender packages (zip files) in a separate award project to participants without login! (Advantages: Recipients and specialist planners do not see bidders and sensitive data such as bid checks, contracts, etc. can be managed without access permissions). Plot orders are also handled by manually sending plans to participants without login, entering order data via text message. In the "Sending" activity category, a recipient is highlighted in green as soon as he or she has clicked on Download in the e-mail (expand activity with triangle).
As soon as at least one participant with plan approval permission exists in the project, the approval system for plans is activated. Now, when uploading a plan, you have to select whether an approval is required for this plan. If this plan is to be approved, you can select who is to approve it from a list of all participants with plan approval permission.
A participant is automatically notified by e-mail when a plan is awaiting approval. The participant can now approve or comment on the plan – Comment via text and/or attachment. The plan author automatically receives the status update by e-mail.
For documents, the approval system is always active and an approve can always be requested by all participants.
If a participant is deleted (right-click on participant and "Delete participant"), all download links in e-mails already received are deactivated. Furthermore, a participant's project access can be revoked by changing its permission to "Participant without login". Deleted project participants and participants without login will no longer have project access. Deleted participants are moved to the recycle bin (activities are still accessible in the recycle bin. Restoring is possible at any time).
Project owners can easily transfer individual projects to participants. All rights (e.g. ownership of data, granting of access rights) and obligations (e.g. payment obligation) are passed on to the new owner. The prerequisite for each project transfer is that the future owner address is a participant in the project and the account is provided with a plan selection.
The message test phase appears when a user has created their own project but their account is not provided with a plan selection. With Planfred, all projects of an office should be owned by the paying user account. With the "Project transfer" function, projects can be transferred to the assigned office user account at any time and seamlessly continued.
login of the project owner to the project to be transferred
create future project owner (assigned office user account) as project participant
under Settings & Backup (top right) click on Project transfer
now Transfer project to, select new project owner and Start project transfer
The future project owner will automatically be informed by email about the project transfer approval. By clicking Apply and Accept Project in the email, Planfred opens in the browser where the project can be accepted and thus the project transfer can be completed.
After the transfer, the original project owner is no longer in the test phase, has administrator rights in the project and can also be deleted if necessary.
Hint
We recommend using an unpersonalised email address for the project owner's paid user account. All projects are to be created via this user account – thus all data is owned by this email address.
The "Project transfer" function can be used to change the user account of the project owner that is subject to payment. This account is only used to create new projects and to manage the order data.
create the future owner address as a participant in all projects (recommendation: name only "-" and role e.g. "account")
login with the future owner address, click on User account (top right), Plan selection (MINI, MIDI or MAXI), select payment interval and enter billing address
login as project owner in each own project and carry out project transfer as described above
after completing the project transfer, change the Plan selection to "FREE" in the user account of the original project owner
Hint
If a project is to be transferred to the builder, for example, who is not yet a participant, we recommend creating and inviting the builder as a new participant. This way, the registration is already done and the builder only has to provide his account with a plan selection.
Whether for messages, approval requests or comments - text blocks support Planfred users in composing texts. These blocks can be created and edited individually for the following applications:
Message when sending plans and documents
Approval request
Personal message to new project participant
Comment when creating or updating plans or documents
Type message into the text field
Select parts or the entire text
Click on Save selected text as a block
Enter the text block name in the pop-up window
Edit text if necessary
Click on save
NOTE: Text blocks that were created, for example, for the document upload are NOT available for selection when approval requests are written. They only appear where they were created and saved.
Hint
Any number of stored text blocks can be combined to form a message.
This makes adding new projects very convenient, and the settings (plan folders, roles, and tags) don’t need to be added again every time.
When adding a new project, just click the link “apply project settings from another project”
Select the desired project from the list… finished
The project settings can be changed again as usual later on
Hint
Save projects as a template. Create a new project, adjust settings, and save as “_TEMPLATE-XY”, etc.
A document can be assigned an access permission to restrict visibility to selected participants. Administrators always have access to all documents.
Create new document as usual
Click on ONLY ACCESSIBLE BY:
Select participants
save
Hint
Save selection of participants as personal preselection: Click above on + Create participant selection, enter name and save.
Hint
By right-clicking on a document and selecting Edit permission, access can be subsequently restricted or edited.
NOTE: In the Project backup, all documents with restricted access are always available. Therefore, we recommend managing sensitive documents such as cost tracking, contracts, audits, etc. in a separate project with a small group of participants.
The approval status of plans and documents is clear by means of a simple filterable traffic light system in the colors yellow (approval requested), red (comments) and green (approved).
CAUTION: For green marked approved plans, all comments/annotations added to the plan by the reviewers should already be incorporated. It should also be apparent from the index that the plan has been approved (not a preliminary pull).
The approval of plans can only be requested by participants with a plan approval permission. In the participant list view, these are marked with a check mark (right).
Click with the right mouse button on a participant and select Grant plan approval permission (only administrators are authorized to do this).
Grant plan approval permission to another participant or withdraw it if necessary (right-click function Revoke plan approval permission)
Hint
In contrast to plans, the approval of documents can always be requested by all participants without approval permission.
Any participant can request a review when creating or updating plans by selecting below This index requires approval by ….
Selecting the people who should approve the plan
Adding text message for the approval request
Click on Save index and return to list
Each reviewer will automatically receive the approval request by email
CAUTION: During the first review run of a plan that has not yet been approved, the index should be marked "Preliminary", as the comments expected from the reviewers still need to be incorporated into the plan.
Hint
With the filter … to be approved by me (next to the Plans and Documents tab), each participant has an overview of all approval requests by him.
Click on the respective plan or use the right mouse button Open in new window.
Click on Copy & edit plan (top right next to "Current index")
Selection below This index requires approval by …, selection of whom, add text message and Save
Hint
Also the persons from whom an approval was requested can be changed afterwards. Click on the respective plan and Edit approval (top right next to "Current Index").
In the Plans tab, click on the personal filter … to be approved by me.
Select and download the plan (if necessary, download the other reviewers' comments as well) and correct it
Select one of the options COMMENT or APPROVAL
At COMMENT add file and/or text message and Save comment
At APPROVAL write text message and Send index approval
The plan author will automatically receive a status update via email
Hint
An approval with comments is handled with the COMMENT option, since various small details such as the index still need to be incorporated into the original plan and it should therefore not be marked as approved.
The plan author revises the plan
Click on Update plan and upload plan with new index
The plan author can now request a new approval or mark the plan itself as released by selecting the option "This revision is approved by me" (he has already received the approval in the form of a comment)
Click on Save index
Hint
Plan approval is available starting with the Midi package.
Planfred extends the right-click menu with powerful edit functions and thus increases the ease of use. Many properties such as changing the plan folder or adding tags can now be edited directly in the list view without opening the plan detail.
With direct list editing of plans and documents you keep an even better overview and the time expenditure is noticeably reduced.
Filter the desired plans or documents in the list view
Sort by eg. Plan number by clicking on Plan number in the table header
Right click on a plan
Select the desired activity:
Download PDF or DWG
Update plan, in new window …
Edit number/content
Edit plan folder
Edit tags
Edit plan author
save
In Planfred, all project participants always have access to the entire set of plans. However, individual documents can be given access permission. A superordinate access permission takes place via different projects. Administrators can import all relevant plans and documents from another project with a few clicks.
After the building permit procedure has been completed, an execution project is created. All relevant plans and documents are imported into the execution project, resulting in a cleaned-up project for the respective companies.
Before the first import of e.g. plans, make sure that the plan numbers do not contain an index or date. Planfred compares the plan numbers of both projects (also those in the recycle bin) during the transfer process and already existing plans in the target project are updated if necessary (e.g. with a new index).
Create new project e.g. execution project and Apply project settings from another project e.g. from permit project
In the execution project, click on Import plans from other project (button next to "Create new plan" - only visible to admins) and select the project from which the plans are to be imported.
Filter the plans and select them using the checkbox
Click on Next at the bottom
Select import settings (only when importing released plans and documents)
Click on Import x plans
Import documents in the same way from another project
Hint
Only the current index of a plan or the current version of a document is imported. The history can only be accessed in the source project.
Hint
Participants can also be imported from another project. You can set them to be imported as "Participants without login". Invitation afterwards: right-click on the participant, select Edit permission , select Project participant or administrator , optionally write a message and invite & back to list.
If, for example, various plan changes are not to be visible to the executing companies, it is advisable to work on these in a separate project with a small group of participants. Once the plan changes are completed, the approved plans are imported back into the main project. (existing plans are updated) and thus published.
Create a separate project and import the plans to be approved from the main project
Edit the plans as usual (request approvals, update plans, etc.)
Now import the plans to be published from the approval project into the main project (target project).
Check the list of existing plans in the target project and the indexes selected for import and choose between the options Update plan (below Update all ) or Create as new plan .
Click on Next step
Edit Import Settings and click on Import x plans
Hint
If the most recent plan index already exists in the target project, it cannot be imported again (plan selection is not possible). Plans that are in the approval process (coloured yellow and red) cannot be imported either.
The “Multi-Edit” function allows you to quickly edit the properties of several plans at once. With a few clicks, plan folders, authors, tags or top categories (optional) of different plans can be changed simultaneously.
Several execution plans are to be moved to the installation drawings folder:
Click on Edit next to “Update plan” or “Create new plan”
Display the execution plans with the help of the filter system
Select the plans to be changed by clicking on the checkbox (to the left of the plan number) or click on select all, if all filtered plans are to be edited
Click on Edit in the lower center of the screen
Select the desired plan property rubric Plan folder by clicking on it
Click on Installation drawing to change the plan folders of the selected plans
Finally click on Update x plans